How to Check for Open Permits on a House in Orange County (2026)

Quick answer: Find out which government issues permits for the address, then search its portal. Unincorporated Orange County uses Fast Track; Winter Garden uses BS&A Online; Ocoee, Orlando and the Town of Windermere (through its contractor, PDCS) each have their own search. Look for any permit not marked finaled or closed. Under the Florida standard contract, the seller pays to close them, up to the Permit Limit.

An open permit found late in a sale can hold up the closing. This article covers how to look one up for a home in Orange County, what the status means, what Florida law says about closing old permits, and who pays under the Florida Realtors/Florida Bar contracts. It uses section 553.79 of the Florida Statutes (2026), the county's and each city's permit pages, the 2026 contract forms, and the City of Orlando's open permit data. For the owner, tax and deed side of the same home, see our guide to Orange County property records.

Step 1: find out who issued the permits

Permits are issued by the government that has jurisdiction over the land, not the one named in the mailing address. A "Windermere" or "Winter Garden" address in Horizon West or the Dr. Phillips area is usually unincorporated Orange County, while homes inside the City of Winter Garden, the City of Ocoee or the Town of Windermere are permitted by those governments. The Property Appraiser's record shows the municipality for every parcel; the Town of Windermere's own FAQ tells residents to check it the same way.

If the parcel is inPermits come fromWhere to searchPhone
Unincorporated Orange County (Horizon West, Dr. Phillips, Gotha, Windermere-address homes outside the town)Orange County Division of Building SafetyFast Track Online Services: Permit Search and Properties (address or parcel). No account needed to search407-836-5550
City of Winter GardenWinter Garden Building DepartmentBS&A Online, the city's permit system407-656-4111 ext. 5136
City of OcoeeOcoee Building DivisionOcoee eService Citizen Portal, Permit Search (first-time users create a free account)407-905-3100 (city hall)
Town of WindermereThe town's building department, run by PDCS, LLC; lakeshore or wetland work may also need an Orange County environmental permit, so ask the townPDCS's Windermere "view permits" page, linked from the town's FAQ407-277-9795 (PDCS)
City of OrlandoOrlando Permitting ServicesPermit and project lookup on orlando.gov, plus the city's open data permit table407-246-2271

Sources: Orange County Fast Track Building Permits and Properties pages; City of Winter Garden Building page and Building FAQ; City of Ocoee eService Citizen Portal; Town of Windermere Development Services page and FAQ; City of Orlando View Permitting Data and Renew, Extend, Close or Withdraw a Permit pages (all checked October 25, 2026). Other cities and towns have their own building departments or contractors.

Step 2: search, and know the system's limits

Orange County Fast Track

Fast Track's Building Permits search works by street number and name, permit number or issue date range; date ranges are capped at six months. The county warns that an address search returns only building records tied to an address, and points you to the Properties search to see every record on a parcel, such as flood permits, plats and variances. Permits issued before June 4, 2012 sit in a separate Historical Permit Search. If you type only the start of a street name, Fast Track also returns streets that begin the same way, so a search for "Lake" includes "Lakeside". The county also says not every older record has been entered; if you expect a permit and cannot find it, call Building Safety.

The cities

Winter Garden's permits are kept in BS&A Online; call the Building Department if a record does not come up. Ocoee's portal asks first-time users to create a free account. Orlando says its lookup accepts a permit number, address, project name or parcel ID, and the city also publishes its permits in its open data portal. For the Town of Windermere, use the PDCS permit page or call PDCS. Permit files are public records under chapter 119, Florida Statutes, so any of these offices can also send a property's permit history on request.

What to read on each permit

  • Type and description: roof, re-roof, A/C change-out, water heater, electrical, pool, fence, addition, solar.
  • Status: finaled, closed, issued or open, expired, void, on hold. Terms differ by office, so ask if a status is unclear.
  • Inspections: the last passed inspection, and whether a final inspection was ever requested.
  • Dates: issue date and last activity.
  • Contractor: whoever pulled it, useful if you need them to come back.

Also compare what you see in the house with what the records show. A screened room, garage conversion, pool or second-floor addition with no permit at all is a separate problem from an open permit, and the contract treats both the same way (below).

What "open" and "expired" mean

An open permit was issued but never received its final inspection. In Florida, a permit for a single-family home expires one year after it is issued, or on the effective date of the next edition of the Florida Building Code, whichever is later, unless the local government extends it (section 553.79(1)(c)). Local rules can end a permit sooner when work stalls: Winter Garden's FAQ says a permit expires if work does not start and an inspection is not requested within 180 days of issue, or if work is suspended for 180 days. An expired permit without a final inspection is still unresolved.

Why it matters: the work was never signed off as meeting code; a title or lien search may flag it; and your insurer, your lender, or the next buyer may ask about it. Winter Garden's FAQ adds that unpermitted work found later is charged triple the normal permit fee as an after-the-fact permit.

How common it is

The City of Orlando publishes the status of its permits in its open data portal; we did not find a similar public table for Orange County or the other cities. We counted its one- and two-family home permits, building and trade, issued from 2021 through 2024, roughly two to six years before the data was pulled.

Permit typeIssued 2021–2024Still "Open" in October 2026Share open
Roof16,9713662.2%
Mechanical repair5,5355069.1%
Plumbing repair3,0682618.5%
Electrical repair2,1351929.0%
Building alteration1,9901969.8%
Pool1,570956.1%
Fence1,03315915.4%
Addition5146512.6%
Electrical, solar2,6201134.3%
All one- and two-family building, electrical, plumbing, mechanical and gas permits69,4702,9854.3%

Our count from the City of Orlando open data "Permit Applications" table (data.cityoforlando.net, dataset ryhf-m453), pulled October 25, 2026: plan review type "Residential 1/2", issue date January 1, 2021 to December 31, 2024, status exactly "Open". Other statuses were Finaled, Closed, Hold and similar. Orlando's numbers describe only the City of Orlando.

The pattern is the useful part. Repair permits for mechanical, plumbing and electrical work were left open about four times as often as roof permits, and fences, additions and alterations were left open most often. Those are the permits to look for first on a home that has had updates.

How an old permit gets closed

Section 553.79(16), Florida Statutes, gives owners three routes:

  • Any licensed contractor can close it. The owner may use the original contractor or hire a different one. A new contractor is liable only for its own work, not the original contractor's defects.
  • The owner can act as owner-builder, within the limits of the owner-builder rules in sections 489.103(7) and 489.503(6).
  • Expired but substantially complete: if the building department agrees the work is substantially complete, the permit can be closed without a new permit, under the code in effect when the permit was applied for.

The same subsection lets a building department close a permit on its own 6 years after it was issued, without a final inspection, if it finds no apparent safety hazard. And section 553.79(17) protects buyers: a local government may not refuse a permit to, cite, fine or charge an arm's-length buyer solely because a previous owner's permit was never closed. It keeps its remedies against the old owner and contractor. That protection does not make the work itself compliant, so a buyer can still inherit the cost of fixing it.

Closing usually means a final inspection, so an inspector may need to see wiring, framing or plumbing that is now behind drywall. Fees and the steps to reopen an expired permit differ by office; ask the building department before you start.

Who pays to close them in a sale

Standard contract (FR/BAR-7x)AS IS contract (FR/BAR AS IS-7x)
Seller's statementParagraph 10(b): no known unpermitted improvements or permits not closed, except as disclosed in writingSame, paragraph 10(b)
Buyer's checkPermit Inspection during the Inspection Period, with written notice to the seller, paragraph 12(d)Part of the buyer's inspections; buyer may cancel during the Inspection Period
Seller's dutyGet a licensed estimate within 10 days; close identified permits and permit unpermitted work no later than 5 days before closing, up to the Permit LimitHand over plans and records and cooperate with the buyer's estimates, paragraph 12(c); not required to spend money
Spending capPermit Limit in paragraph 9(a)(iii): the amount written in, or 1.5% of the price if left blankNone
If the cost is higherSeller may pay the excess, or buyer may take the home as is with a credit equal to the Permit Limit; otherwise either may cancel and the buyer's deposit is refundedNegotiated, or the buyer cancels within the Inspection Period

Source: Florida Realtors/Florida Bar Residential Contract for Sale and Purchase (FR/BAR-7x) and AS IS Residential Contract (AS IS-7x), 2026 update redlines published by Florida Realtors, February 2026 (checked October 25, 2026). Contracts can be changed by addendum; read the one you signed.

On a $500,000 sale under the standard form with the blank left empty, the Permit Limit is $7,500. If the final inspection is delayed by the building department, the standard form extends closing up to 10 days before either party can cancel. Our article on selling a house as is in Florida covers the AS IS form in more detail.

What to do next

  • Selling: search your own address before you list. Closing a permit before you are under contract keeps it off the contract's 10-day and 5-day deadlines.
  • Buying: run the search in the first days of the Inspection Period, and give written notice before it ends; compare the records with what the home inspector sees. Our home inspection guide covers the rest of that period.
  • The permit is old and the work looks finished: ask the building department whether it can be closed as substantially complete, or under the 6-year rule.
  • The work was never permitted: talk to a licensed contractor about an after-the-fact permit before you price the repair.

Frequently asked questions

How do I find out if a house has open permits in Orange County, FL?

Check the Property Appraiser record for the municipality, then search that government's permit system: Fast Track for unincorporated Orange County, or the city or town portal. Call the building department if a permit you expect is missing.

Can you sell a house with an open permit in Florida?

Yes. Under both Florida Realtors/Florida Bar forms the seller states in writing any open permits or unpermitted work they know of, and the contract sets who pays to close them. A buyer on the AS IS form can cancel during the Inspection Period instead.

Does an open permit transfer to the new owner?

The permit stays attached to the property's record. Florida law bars the local government from fining or refusing a permit to an arm's-length buyer solely because of a previous owner's open permit, but the unfinished work becomes the buyer's problem.

Does the title company check for open permits?

A 2019 Florida Senate staff analysis noted that title companies, closing agents and real estate attorneys research properties for open or expired permits. Under the standard form, the seller pays for a municipal lien search when certain title options are checked, but the form defines that search as one for certain unrecorded government liens, not permits. Ask your closing agent what their search covers.

Can the county close a permit on its own?

Yes, 6 years after issue if it finds no apparent safety hazard (section 553.79(16)(c)). It may also close an expired permit for work it finds substantially complete.

Listing your home or under contract and want help reading a permit history? Send us the address and we will go through the records with you. See how we prepare a home for sale, or call Infinity Realty Group, LLC at 407-234-2256.

This article is general information, not legal advice. Permit rules, fees and portal features change; confirm them with the building department for the property, and talk to a Florida real estate attorney about a specific contract. Buying a home with us

Sources: Florida Statutes (2026), section 553.79, subsections (1)(c), (16) and (17) (checked October 25, 2026); Orange County Fast Track Building Permits and Properties pages; City of Winter Garden Building page and Building FAQ; City of Ocoee eService Citizen Portal; Town of Windermere Development Services page and FAQ; City of Orlando View Permitting Data and Renew, Extend, Close or Withdraw a Permit pages (all checked October 25, 2026); City of Orlando open data, Permit Applications table (pulled October 25, 2026), our count; Florida Realtors/Florida Bar Residential Contract FR/BAR-7x and AS IS Contract AS IS-7x, 2026 update redlines (checked October 25, 2026); Florida Senate staff analysis of SB 902 (2019) on open and expired permits.